Skip to main content

Umbro Distribution Centre, Deeside, UK

European Sheeting Ltd were nomimated by the client to design, supply and install in excess of 35000m2 of Kingspan roof and wall cladding systems. The building is the European distribution centre for Umbro Sportswear and is operated by Great Bear Distribution. The construction was a fast track build and the cladding element of the works was completed in a 16 week period. ESL meticulous pre-stage logistic and programmed planning ensured the building was delivered in time and to the required high standard that both ESL and our value client expect.

Status: Completed

Client: Umbro

Contractor: Eric Wright Construction Ltd