Skip to main content

Pall Mall House, Manchester

EnviroSips Ltd has been appointed as Principal Contractor to remove and replace combustible cladding at Pall Mall House Manchester. This traditional low rise building was  totally reconfigured and upgraded in 2007, adding a further 6 floors to the building. The external façade of the top 6 floors consists of ACM, aluminium and copper cladding. All elements will be removed to eliminate flammable materials and allow fire enhancement works to be carried out to the through wall construction. Elements of the copper and aluminium will be reused with a new carrier system and fire breaks. ACM will be replaced with none combustible aluminum cladding. Works are due to be completed in the summer of 2020.

Status: In Progress

Client: Heylo Housing / Thomasons / Urban Bubble

Contractor: EnviroSips Ltd