European Sheeting Ltd were called in by Capital Construction Management to provide a long term economical solution to rectify a deteriorated roof covering that was having a severe impact on furniture productivity below. ESL embarked on a 12 week programme of overcladding in excess of 5000M2 of roof covering with single skin sheeting and fixing walksafe steel membrane linings to the existing gutters. This work was planned and carried out without any disruption to the manufacturing below ensuring that health and safety of all involved was paramount at all times.
Status: Completed 2012
Client: Westbridge Furniture / Flintshire County Council
Main Contractor: Capital Construction Management