Moss Side Leisure Centre, Manchester, UK

European Sheeting Ltd were awarded the removal and replacement of the roof and wall cladding to Moss Side Leisure Centre by our valued client ISG who are fully refurbishing the existing 1970’s building. The facility incorporates a swimming pool, sports halls and a gym. The was brought up to current building regulations using Kingspan insulated roof and wall cladding systems fully designed by our in-house design department.

Status: Completed November 2018

Client: Manchester City Council

Main Contractor: ISG

ESL Group is committed to the environment and has a duty of care to carry out all activities in a responsible manner with due care for the environment.
We are totally committed to the reduction of carbon and toxic emissions and take very seriously the implementation and execution of our re-cycling policy.