Incubator Building, Warrington, UK

European Sheeting Limited were awarded the design, supply and installation of the roof and wall cladding for the Incubator Building at the Stadium Quarter, Warrington. This consisted of a Kingspan Insulated Topdeck roof covering / single ply membrane over three levels. The wall construction is an EnviroSips backing wall solution mounted to the outside of the steel structure. This gives an unrivalled thermal and air leakage performance on the BREEAM Excellent required building. The external finishes are PPC aluminium column and channel profiles.

Status: Completed July 2015

Client: Warrington Borough Council

Main Contractor: ISG PLC