ESL Awarded UTC Warrington

Following the successful completion of the Incubator Building at the Stadium Quarter Development in Warrington, European Sheeting Ltd have today been awarded further repeat business with our valued UK client ISG PLC. ESL have been engaged to design, supply and install the roof and wall façade cladding to the new University Technical College (UTC).

Opening in September 2016, UTC aims to address the growing skills gap within local engineering and energy businesses by offering students the opportunity to study specialist engineering qualifications alongside GCSEs and A Levels.

With the Manchester Metropolitan University School of Engineering behind UTC Warrington students can look forward to a STEM rich curriculum, with access to the best educational facilities in the North West. The college will house £1m of specialist equipment; additionally students will be able to access facilities at MMU locations across the region and industry specific equipment at employer partner sites such as Sellafield Ltd, Amec Foster Wheeler, Tenet Consultants.

ESL have commenced the design process with a proposed site start in January 2016.


Comments are closed.

ESL Group is committed to the environment and has a duty of care to carry out all activities in a responsible manner with due care for the environment.
We are totally committed to the reduction of carbon and toxic emissions and take very seriously the implementation and execution of our re-cycling policy.