Caterpillar Regional Parts Distribution Centre, JAFZA Dubai

ESL Export Ltd completed the fast track installation of 51000m2 of Kingspan Insulated firesafe roof and wall panel systems for the prestigious Caterpillar Regional Parts Distribution Centre at Jebel Ali Free Zone in Dubai. The project envelope has been fully designed and installed to robust Factory Mutual and Kingspan detailed standards by ESL Export Ltd in-house design department. This challenging fast track scheme was carried out in a 12 week period.

Status: Completed 2012

Client: Caterpillar

Main Contractor: GSE Design & Build, Abu Dhabi


ESL Group is committed to the environment and has a duty of care to carry out all activities in a responsible manner with due care for the environment.
We are totally committed to the reduction of carbon and toxic emissions and take very seriously the implementation and execution of our re-cycling policy.